Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
CGI Driveway & Pavers: The Los Angeles Owner’s Guide
CGI driveway and paver installations in Los Angeles typically run $8,260-$21,240 for a complete paver driveway, or $5,310-$14,160 for concrete, depending on substrate condition and access. Rowan Construction Group Los Angeles stocks CGI-compatible edge restraints, bedding sand, and paver units for common series, and we carry the full line of Belgard and Techo-Bloc alternatives when a match isn’t available. Most homeowners notice a problem when settling creates pooling after rain, or when edge restraints pop loose and the field pattern starts to drift - issues that worsen fast in Los Angeles’s clay-heavy soil zones like the Westside basin.
Which CGI Models This Applies To
CGI, or Concrete Graphics Incorporated, produced several paver series through the mid-2000s before shifting focus to commercial imprinted concrete systems. The residential lines most common in Los Angeles are the CGI Cobblestone series, the Roman Circle kit, and the linear Plaza Stone in 4×8 and 6×6 formats. If you’re trying to match existing CGI pavers, check the underside for a molded “CGI” stamp and a two-digit year code - the 02-08 range is typical for Los Angeles installations. The color batch number, usually a four-digit code on the pallet tag or a faded sticker on the edge restraint, matters more than the series name for visual matching.
We’ve learned that CGI’s edge restraint profile, a 6-inch L-shaped PVC with a unique top-lock groove, doesn’t interchange with standard BrickStop or Perma-Edge products. For bedding sand, CGI specified ASTM C-33 washed concrete sand at 1-inch screeded depth, which is coarser than the masonry sand some Los Angeles yards still stock. When we can’t source OEM CGI edge restraint, we fabricate a compatible anchor from galvanized steel and reuse the existing top-lock pins - it’s documented in your photo record, and it holds. We also source from our vetted Belgard and Techo-Bloc lines when a full field replacement makes more sense than chasing discontinued inventory.
Signs Your CGI Driveway & Pavers Is Failing

- Pooling water after light rain. This usually means the bedding sand has washed out or compacted unevenly, creating low spots in the field. In Los Angeles, where irrigation runoff and occasional heavy downpours alternate with dry spells, sand migration happens faster than in wetter climates.
- Edge restraints pulling away from the border. The PVC grows brittle in UV exposure, and the 12-inch spike spacing CGI originally specified isn’t always enough where tree roots or soil heave are active. Once the restraint loosens, the field pavers drift outward and the pattern degrades.
- Individual pavers rocking underfoot. A single loose paver means the bedding layer beneath it has eroded or the paver itself has cracked. Stepping on it grinds sand into the joint and accelerates surrounding failure.
- Weeds or grass sprouting in joints. This signals that polymeric joint sand has washed away or was never installed. Open joints let water penetrate to the base, which in Los Angeles’s expansive clay soils leads to differential settling.
- Visible cracks or spalling on the paver surface. CGI’s older color-through units were durable, but freeze-thaw cycling in the San Gabriel foothills or de-icing salt from adjacent concrete can cause surface delamination. Once the wear layer is breached, moisture accelerates deterioration.
Before
AfterReplacement Cost & What’s Included
For CGI paver driveway work in Los Angeles, our installed pricing follows the ranges below. Every quote is a flat written price with line-item scope before any work starts - Clause 1 of The Haven Standard.
| Service | Price Range (Los Angeles) |
|---|---|
| Paver driveway installation (new) | $8,260 - $21,240 |
| Concrete driveway installation | $5,310 - $14,160 |
| Driveway replacement (remove and replace) | $5,900 - $16,520 |
| Driveway sealing (maintenance) | $295 - $825 |
| Paver patio installation | $4,130 - $12,980 |
What drives the range: substrate condition (whether we need to remove and recompact base material), access for equipment, and whether we’re matching discontinued CGI inventory or transitioning to a current Belgard or Techo-Bloc equivalent. Our quotes include removal and disposal of failed material, base regrading and compaction to 98% standard Proctor density, bedding sand, paver installation with proper joint spacing, polymeric sand sweep and activation, and edge restraint anchoring. The 365-Day Done Right Promise applies to all paver and driveway work. No change proceeds without a signed change order - the discipline that has kept our projects within a few percent of the agreed price since 2007.
DIY or Call Us?

There’s a safe middle ground for homeowners. You can check for the CGI stamp and year code yourself, photograph the edge restraint profile, and measure the affected area in square feet - that information lets us prepare accurately before arriving. You can also verify whether water pools consistently in the same spots, which tells us whether it’s a localized bedding issue or a broader base problem.
Where DIY goes wrong: lifting pavers without proper base compaction underneath guarantees recurrence, and hand-tamping doesn’t achieve the 98% density we verify with a nuclear gauge. Polymeric joint sand requires precise activation - too much water washes out the binder, too little leaves it powdery and vulnerable. And in Los Angeles, where many CGI installations abut city sidewalk or curb, disturbing the interface without understanding permit requirements can trigger a Department of Public Works correction notice. For anything beyond a single loose paver in an inconspicuous area, the documented approach is worth the call. Reach us at (213) 652-7670 for a free written estimate.
FAQs
CGI pavers installed with proper base and bedding typically last 20-30 years in Los Angeles before significant degradation, though edge restraints often need attention at 10-15 years due to UV exposure and soil movement. The clay-heavy soils in neighborhoods like Palms and Mar Vista accelerate settling compared to the sandier ground in the San Fernando Valley. Call (213) 652-7670 for an exact assessment - estimates are free.
Yes, if the base is intact and failure is limited to edge restraint, joint sand, or isolated paver units - we can lift, regrade, and relay sections without full removal. When the base has washed out or tree roots have compromised the subgrade, spot repairs become a recurring expense and replacement is the honest recommendation. Call (213) 652-7670 for a line-item quote on both options.
A typical residential driveway replacement runs 3-5 days in Los Angeles: one day for removal and base prep, one day for compaction and bedding, one to two days for paver laying and cutting, and a final day for joint sand and edge anchoring. Weather and permit inspections can extend this - we include the realistic schedule in every written quote, not an optimistic one.
We stock compatible edge restraints, bedding sand, and polymeric joint sand on every driveway and pavers crew vehicle. Specific CGI paver units are sourced per job - the line has been discontinued for years, so we match from existing inventory or transition to Belgard or Techo-Bloc equivalents with comparable compressive strength and absorption specs. Your photo record includes the sourcing decision and the match verification before installation begins.
Written by Grant Rowan, Owner, Rowan Construction Group Los Angeles at Rowan Construction Group Los Angeles, serving Los Angeles and nearby areas.







Before
After
Before
After
Before
After